Case Study – Arlington, MN
PeopleService understands the importance of having knowledgeable, highly trained professionals on board to ensure all facilities operate smoothly.
PeopleService has been operating the Arlington Water and Wastewater Treatment Facilities since 2007. The water system in the city of Arlington consists of pre-aeration, permanganate addition, a 3 cell detention tank, a 4 cell sand filter, a 90,000 gallon clear well, chlorine and fluoride addition, a 300,000 gallon water tower, 2 wells and a distribution system of 1,200 service connections with 180 fire hydrants. PeopleService is also in charge of all water meter replacement and service. PeopleService has been operating the Green Isle Water Treatment Facility since 2011. The water system in the City of Green Isle consists of pre-treatment addition of tonkasorb, a 3 cell pressurized sand filter unit, chlorine and fluoride addition, 100,000 gallon water tower, 2 wells and a distribution system of 280 service connections with 80 fire hydrants.